DL/T 5409《核电厂工程勘测技术规程》分为4部分,本部分是根据《国家发展改革办公厅关于印发2005年行业标准项目计划的通知》的要求进行编制的。本部分规定了核电厂及其附属设施测量的基本技术要求。本部分适用于核电厂及其附属设施规划设计阶段、工程建造阶段的测量工作。运营管理阶段的测量工作可参照本部分执行。
Foreword
1 Scope
2 Normative References
3 General Provisions
4 Horizontal Control Survey
4.1 General Requirements
4.2 Satellite Positioning Survey
4.3 Traverse Survey
4.4 Triangulation Surveys
5 Vertical Control Survey
5.1 General Requirements
5.2 Leveling
5.3 Trigonometric Leveling
5.4 GPS Elevation Survey
6 Topographic Survey
6.1 General Requirements
6.2 Mapping Control Survey
6.3 Surveying and Mapping Method
6.4 Ground Feature Surveying and Mapping
6.5 Surveying and Mapping of Landform
6.6 Underwater Topography Surveying
6.7 Marine Surveying and Mapping
7 Digital Photogrammetry
7.1 General Requirements
7.2 Technical Requirements for Aerial Photography
7.3 Acceptance of Aerial Photography Data
7.4 Photo Control Survey
7.5 Photograph Annotation
7.6 Digital Mapping
7.7 Digital Image Product
Application of Satellite Remote Sensing Technique
8.1 General Requirements
8.2 Date Preprocessing
8.3 Geometric Correction of Image
8.4 Image and Map Decoration
9 Construction Survey
9.1 General Requirements
9.2 Secondary Network Surveying
9.3 Building Micro—grid Control Network Surveying
9.4 Building Micro—grid Control Network Transferring Surveys
9.5 Construction Setting—out and Testing
9.6 Deformation Monitoring
9.7 Data Processing and Result Submission
10 Other Surveys
10.1 General Requirements
10.2 Surveys for Locating Exploration Points and Lines
10.3 Hydrological Survey
10.4 Pipeline Surveying
Appendix A (Normative) Correlating Different Coordinate
Systems
Appendix B (Normative) Specifications for Burying Markers
and Monuments at Horizontal
Control Points
Appendix C (Informative) Description of GPS Control Point
Appendix D (Informative) Recording Format of GPS Surveying
Notebook
Appendix E (Normative) Classification and Basic Technical
Parameters of Theodolite Series
Appendix F (Normative) Formula for Calculating the Initial
Readings of Circle and Micrometer
in Horizontal Angle Measurement
Using Direction Observation
Method
Appendix G (Informative) Calculation of Basic Parameters and
Curvature Radiuses of Earth
Ellipsoids of Geodetic
Coordinate Systems
Appendix H (Informative) Transformation between Zero Points
of the Major Elevation Reference
Systems in China
Appendix J (Informative) Classification and Basic Technical
Parameters of Leveling Instrument
Series
Appendix K (Normative) Types and Specifications of Markers
and Monuments of Elevation Control
Points of Various Accuracy Levels
Appendix L (Normative) Division and Numbering of Map
Sheets
Appendix M (Normative) Specifications and Requirements for
Constructing Control Points of
Secondary Network, Micro—grid
Control Network and Intervisibility
Holes
0《:DL/T 5409.4-2010核电厂工程勘测技术规程(第4部分):测量(英文版)》的主要内容包括:1 Scope;2 Normative References;3 General Provisions;4 Horizontal Control Survey;5 Vertical Control Survey;6 Topographic Survey;7 Digital Photogrammetry等。
书籍详细信息 | |||
书名 | DL/T 5409.4-2010 核电厂工程勘测技术规程. 第4部分. 测量站内查询相似图书 | ||
9787512341050 如需购买下载《DL/T 5409.4-2010 核电厂工程勘测技术规程. 第4部分. 测量》pdf扫描版电子书或查询更多相关信息,请直接复制isbn,搜索即可全网搜索该ISBN | |||
出版地 | 北京 | 出版单位 | 中国电力出版社 |
版次 | 1版 | 印次 | 1 |
定价(元) | 67.0 | 语种 | 英文 |
尺寸 | 21 × 14 | 装帧 | 平装 |
页数 | 印数 |
DL/T 5409.4-2010 核电厂工程勘测技术规程. 第4部分. 测量是中国电力出版社于2013.5出版的中图分类号为 TM623-65 的主题关于 核电厂-勘测-技术规范-中国-英文 的书籍。
国家能源局, 发布
国家能源局, 发布
国家能源局, 发布
中华人民共和国住房和城乡建设部, 组织编译
中华人民共和国国家经济贸易委员会, 发布
国家能源局, 发布
中华人民共和国国家发展和改革委员会, 发布
国家能源局, 发布
国家能源局, 发布