DL/T 5409.4-2010 核电厂工程勘测技术规程. 第4部分. 测量
DL/T 5409.4-2010 核电厂工程勘测技术规程. 第4部分. 测量封面图

DL/T 5409.4-2010 核电厂工程勘测技术规程. 第4部分. 测量

国家能源局, 发布

出版社:中国电力出版社

年代:2013

定价:67.0

书籍简介:

DL/T 5409《核电厂工程勘测技术规程》分为4部分,本部分是根据《国家发展改革办公厅关于印发2005年行业标准项目计划的通知》的要求进行编制的。本部分规定了核电厂及其附属设施测量的基本技术要求。本部分适用于核电厂及其附属设施规划设计阶段、工程建造阶段的测量工作。运营管理阶段的测量工作可参照本部分执行。

书籍目录:

Foreword

1 Scope

2 Normative References

3 General Provisions

4 Horizontal Control Survey

4.1 General Requirements

4.2 Satellite Positioning Survey

4.3 Traverse Survey

4.4 Triangulation Surveys

5 Vertical Control Survey

5.1 General Requirements

5.2 Leveling

5.3 Trigonometric Leveling

5.4 GPS Elevation Survey

6 Topographic Survey

6.1 General Requirements

6.2 Mapping Control Survey

6.3 Surveying and Mapping Method

6.4 Ground Feature Surveying and Mapping

6.5 Surveying and Mapping of Landform

6.6 Underwater Topography Surveying

6.7 Marine Surveying and Mapping

7 Digital Photogrammetry

7.1 General Requirements

7.2 Technical Requirements for Aerial Photography

7.3 Acceptance of Aerial Photography Data

7.4 Photo Control Survey

7.5 Photograph Annotation

7.6 Digital Mapping

7.7 Digital Image Product

Application of Satellite Remote Sensing Technique

8.1 General Requirements

8.2 Date Preprocessing

8.3 Geometric Correction of Image

8.4 Image and Map Decoration

9 Construction Survey

9.1 General Requirements

9.2 Secondary Network Surveying

9.3 Building Micro—grid Control Network Surveying

9.4 Building Micro—grid Control Network Transferring Surveys

9.5 Construction Setting—out and Testing

9.6 Deformation Monitoring

9.7 Data Processing and Result Submission

10 Other Surveys

10.1 General Requirements

10.2 Surveys for Locating Exploration Points and Lines

10.3 Hydrological Survey

10.4 Pipeline Surveying

Appendix A (Normative) Correlating Different Coordinate

Systems

Appendix B (Normative) Specifications for Burying Markers

and Monuments at Horizontal

Control Points

Appendix C (Informative) Description of GPS Control Point

Appendix D (Informative) Recording Format of GPS Surveying

Notebook

Appendix E (Normative) Classification and Basic Technical

Parameters of Theodolite Series

Appendix F (Normative) Formula for Calculating the Initial

Readings of Circle and Micrometer

in Horizontal Angle Measurement

Using Direction Observation

Method

Appendix G (Informative) Calculation of Basic Parameters and

Curvature Radiuses of Earth

Ellipsoids of Geodetic

Coordinate Systems

Appendix H (Informative) Transformation between Zero Points

of the Major Elevation Reference

Systems in China

Appendix J (Informative) Classification and Basic Technical

Parameters of Leveling Instrument

Series

Appendix K (Normative) Types and Specifications of Markers

and Monuments of Elevation Control

Points of Various Accuracy Levels

Appendix L (Normative) Division and Numbering of Map

Sheets

Appendix M (Normative) Specifications and Requirements for

Constructing Control Points of

Secondary Network, Micro—grid

Control Network and Intervisibility

Holes

内容摘要:

0《:DL/T 5409.4-2010核电厂工程勘测技术规程(第4部分):测量(英文版)》的主要内容包括:1 Scope;2 Normative References;3 General Provisions;4 Horizontal Control Survey;5 Vertical Control Survey;6 Topographic Survey;7 Digital Photogrammetry等。

书籍规格:

书籍详细信息
书名DL/T 5409.4-2010 核电厂工程勘测技术规程. 第4部分. 测量站内查询相似图书
9787512341050
如需购买下载《DL/T 5409.4-2010 核电厂工程勘测技术规程. 第4部分. 测量》pdf扫描版电子书或查询更多相关信息,请直接复制isbn,搜索即可全网搜索该ISBN
出版地北京出版单位中国电力出版社
版次1版印次1
定价(元)67.0语种英文
尺寸21 × 14装帧平装
页数印数

书籍信息归属:

DL/T 5409.4-2010 核电厂工程勘测技术规程. 第4部分. 测量是中国电力出版社于2013.5出版的中图分类号为 TM623-65 的主题关于 核电厂-勘测-技术规范-中国-英文 的书籍。